More and more companies are unifying their corporate networks into a single network for types of traffic (e.g., Internet and voice) in order to lower operation costs and man-hours. This trend has increased the need for reliability in the backbone network. This has in turn made it necessary to have redundancy in the network to provide backup in the event of failure. However, implementing redundancy results in problems related to cost and quality.

KDDI's Dual Access Service is a new service that provides hot standby for KDDI Powered Ethernet access, which has an SLA 99.99% network availability. KDDI's new proprietary system "SENS"[1] (patent pending) makes is possible to easily enjoy the same high level of quality and an even a higher level of reliability for a reasonable rate.

| [1] |
SENS stands for Super-stable Ethernet Network System |


Hot standby in the access zone makes it possible to automatically switch to the backup line in the event that the main line fails. This results in a reduction in recovery time of several hours to a few seconds! Adding the Dual Access Service to the already very reliable KDDI Powered Ethernet network (SLA 99.99% network availability) achieves an extremely high level of reliability.

Since the switch between lines is made in Layer 2, you do not need to make an integrity check of your routing protocol, configure any devices or making any additional settings. Implementation of KDDI's Dual Access Service is a breeze, with no additional operation load on your behalf.

The backup line is guaranteed to be the same in all aspects (e.g., operations, speed, and quality) of the main line. There is no drop in quality after the switch is made to the backup line as is the case with some best effort models. Moreover, since the backup line shares the same path as the main line, the cost is only 20% of that of the main contract line.







Product Speed (in bps) |
Ethernet (Type G) : 0.5M to 100M Ethernet (Housing) : 10M and 100M |
Service Area |
To be expanded gradually from the 23 wards of Tokyo. |
Interface |
Ethernet (10BASE-T/100BASE-TX) x 1 |
Communication Method |
Full-duplex and half-duplex (fixed) |
Minimum Contract Period |
One year [2] |
SLA |
Recovery time: Guarantee of recover in less than 10 minutes for locations that normally take less than one hour for recovery. |
Notes |
 |
The main contract line and the dual access line will be the same speed. |
 |
One SPU and two DSUs will be installed so three 100 VAC outlets are required. |
|
|

| [2] |
If you already have leased an access line from KDDI, the dual access line's lease will commence from the date it is put into operation. |

If you already have leased an access line from KDDI, the only additional monthly fee will be for the Dual Access Usage Fee.

Fees are determined by the number of offices (locations) that you use. Use the following menu to find out more information about fees.


|
 |

 |  | |



| (Unit: Japanese Yen) |
Product Speed (in bps) |
Main Contract Line |
Dual Access Usage Fee |
Total |
Line Usage Fee |
Wire Equipment Usage Fee |
DSU/ONU Usage Fee |
0.5M |
67,000 (70,350) |
2,000 (2,100) |
5,000 (5,250) |
13,400 (14,070) |
87,400 (91,770) |
1M |
89,000 (93,450) |
2,000 (2,100) |
5,000 (5,250) |
17,800 (18,690) |
113,800 (119,490) |
2M |
133,000 (139,650) |
2,000 (2,100) |
5,000 (5,250) |
26,600 (27,930) |
166,600 (174,930) |
3M |
168,000 (176,400) |
2,000 (2,100) |
5,000 (5,250) |
33,600 (35,280) |
208,600 (219,030) |
4M |
203,000 (213,150) |
2,000 (2,100) |
5,000 (5,250) |
40,600 (42,630) |
250,600 (263,130) |
5M |
236,000 (247,800) |
2,000 (2,100) |
5,000 (5,250) |
47,200 (49,560) |
290,200 (304,710) |
6M |
244,000 (256,200) |
2,000 (2,100) |
5,000 (5,250) |
48,800 (51,240) |
299,800 (314,790) |
7M |
265,000 (278,250) |
2,000 (2,100) |
5,000 (5,250) |
53,000 (55,650) |
325,000 (341,250) |
8M |
285,000 (299,250) |
2,000 (2,100) |
5,000 (5,250) |
57,000 (59,850) |
349,000 (366,450) |
9M |
306,000 (321,300) |
2,000 (2,100) |
5,000 (5,250) |
61,200 (64,260) |
374,200 (392,910) |
10M |
327,000 (343,350) |
2,000 (2,100) |
5,000 (5,250) |
65,400 (68,670) |
399,400 (419,370) |
20M |
392,000 (411,600) |
2,000 (2,100) |
5,000 (5,250) |
78,400 (82,320) |
477,400 (501,270) |
30M |
457,000 (479,850) |
2,000 (2,100) |
5,000 (5,250) |
91,400 (95,970) |
555,400 (583,170) |
40M |
521,000 (547,050) |
2,000 (2,100) |
5,000 (5,250) |
104,200 (109,410) |
632,200 (663,810) |
50M |
586,000 (615,300) |
2,000 (2,100) |
5,000 (5,250) |
117,200 (123,060) |
710,200 (745,710) |
60M |
651,000 (683,550) |
2,000 (2,100) |
5,000 (5,250) |
130,200 (136,710) |
788,200 (827,610) |
70M |
716,000 (751,800) |
2,000 (2,100) |
5,000 (5,250) |
143,200 (150,360) |
866,200 (909,510) |
80M |
780,000 (819,000) |
2,000 (2,100) |
5,000 (5,250) |
156,000 (163,800) |
943,000 (990,150) |
90M |
845,000 (887,250) |
2,000 (2,100) |
5,000 (5,250) |
169,000 (177,450) |
1,021,000 (1,072,050) |
100M |
910,000 (955,500) |
2,000 (2,100) |
5,000 (5,250) |
182,000 (191,100) |
1,099,000 (1,153,950) |
|

| * |
Figures in parentheses include consumption tax. |



| (Unit: Japanese Yen) |
Product Speed (in bps) |
Main Contract Line Usage Fee |
Dual Access Usage Fee |
DSU/ONU Usage Fee |
Total |
0.5M |
48,000 (50,400) |
9,600 (10,080) |
5,000 (5,250) |
62,600 (65,730) |
1M |
50,000 (52,500) |
10,000 (10,500) |
5,000 (5,250) |
65,000 (68,250) |
2M |
62,000 (65,100) |
12,400 (13,020) |
5,000 (5,250) |
79,400 (83,370) |
3M |
76,000 (79,800) |
15,200 (15,960) |
5,000 (5,250) |
96,200 (101,010) |
4M |
95,000 (99,750) |
19,000 (19,950) |
5,000 (5,250) |
119,000 (124,950) |
5M |
114,000 (119,700) |
22,800 (23,940) |
5,000 (5,250) |
141,800 (148,890) |
6M |
170,000 (178,500) |
34,000 (35,700) |
5,000 (5,250) |
209,000 (219,450) |
7M |
184,000 (193,200) |
36,800 (38,640) |
5,000 (5,250) |
225,800 (237,090) |
8M |
198,000 (207,900) |
39,600 (41,580) |
5,000 (5,250) |
242,600 (254,730) |
9M |
212,000 (222,600) |
42,400 (44,520) |
5,000 (5,250) |
259,400 (272,370) |
10M |
227,000 (238,350) |
45,400 (47,670) |
5,000 (5,250) |
277,400 (291,270) |
20M |
277,000 (290,850) |
55,400 (58,170) |
5,000 (5,250) |
337,400 (354,270) |
30M |
328,000 (344,400) |
65,600 (68,880) |
5,000 (5,250) |
398,600 (418,530) |
40M |
378,000 (396,900) |
75,600 (79,380) |
5,000 (5,250) |
458,600 (481,530) |
50M |
429,000 (450,450) |
85,800 (90,090) |
5,000 (5,250) |
519,800 (545,790) |
60M |
480,000 (504,000) |
96,000 (100,800) |
5,000 (5,250) |
581,000 (610,050) |
70M |
531,000 (557,550) |
106,200 (111,510) |
5,000 (5,250) |
642,200 (674,310) |
80M |
581,000 (610,050) |
116,200 (122,010) |
5,000 (5,250) |
702,200 (737,310) |
90M |
632,000 (663,600) |
126,400 (132,720) |
5,000 (5,250) |
763,400 (801,570) |
100M |
682,000 (716,100) |
136,400 (143,220) |
5,000 (5,250) |
823,400 (864,570) |
|

| * |
The wiring equipment rental and the line unit rental are unnecessary. Wire equipment usage fees and DSU/ONU (Termination) Usage Fee are unnecessary. |
| * |
Figures in parentheses include consumption tax. |
|
 |

 |  | |



| (Unit: Japanese Yen) |
Product Speed (in bps) |
Main Contract Line |
Dual Access Usage Fee |
Total |
Line Usage Fee |
Wire Equipment Usage Fee |
DSU/ONU Usage Fee |
0.5M |
66,000 (69,300) |
2,000 (2,100) |
5,000 (5,250) |
13,200 (13,860) |
86,200 (90,510) |
1M |
76,000 (79,800) |
2,000 (2,100) |
5,000 (5,250) |
15,200 (15,960) |
98,200 (103,110) |
2M |
113,000 (118,650) |
2,000 (2,100) |
5,000 (5,250) |
22,600 (23,730) |
142,600 (149,730) |
3M |
138,000 (144,900) |
2,000 (2,100) |
5,000 (5,250) |
27,600 (28,980) |
172,600 (181,230) |
4M |
160,000 (168,000) |
2,000 (2,100) |
5,000 (5,250) |
32,000 (33,600) |
199,000 (208,950) |
5M |
181,000 (190,050) |
2,000 (2,100) |
5,000 (5,250) |
36,200 (38,010) |
224,200 (235,410) |
6M |
197,000 (206,850) |
2,000 (2,100) |
5,000 (5,250) |
39,400 (41,370) |
243,400 (255,570) |
7M |
214,000 (224,700) |
2,000 (2,100) |
5,000 (5,250) |
42,800 (44,940) |
263,800 (276,990) |
8M |
230,000 (241,500) |
2,000 (2,100) |
5,000 (5,250) |
46,000 (48,300) |
283,000 (297,150) |
9M |
247,000 (259,350) |
2,000 (2,100) |
5,000 (5,250) |
49,400 (51,870) |
303,400 (318,570) |
10M |
263,000 (276,150) |
2,000 (2,100) |
5,000 (5,250) |
52,600 (55,230) |
322,600 (338,730) |
20M |
289,000 (303,450) |
2,000 (2,100) |
5,000 (5,250) |
57,800 (60,690) |
353,800 (371,490) |
30M |
315,000 (330,750) |
2,000 (2,100) |
5,000 (5,250) |
63,000 (66,150) |
385,000 (404,250) |
40M |
341,000 (358,050) |
2,000 (2,100) |
5,000 (5,250) |
68,200 (71,610) |
416,200 (437,010) |
50M |
367,000 (385,350) |
2,000 (2,100) |
5,000 (5,250) |
73,400 (77,070) |
447,400 (469,770) |
60M |
394,000 (413,700) |
2,000 (2,100) |
5,000 (5,250) |
78,800 (82,740) |
479,800 (503,790) |
70M |
420,000 (441,000) |
2,000 (2,100) |
5,000 (5,250) |
84,000 (88,200) |
511,000 (536,550) |
80M |
446,000 (468,300) |
2,000 (2,100) |
5,000 (5,250) |
89,200 (93,660) |
542,200 (569,310) |
90M |
472,000 (495,600) |
2,000 (2,100) |
5,000 (5,250) |
94,400 (99,120) |
573,400 (602,070) |
100M |
498,000 (522,900) |
2,000 (2,100) |
5,000 (5,250) |
99,600 (104,580) |
604,600 (634,830) |
|

| * |
Figures in parentheses include consumption tax. |



| (Unit: Japanese Yen) |
Product Speed (in bps) |
Main Contract Line Usage Fee |
Dual Access Usage Fee |
DSU/ONU Usage Fee |
Total |
0.5M |
46,000 (48,300) |
9,200 (9,660) |
5,000 (5,250) |
60,200 (63,210) |
1M |
48,000 (50,400) |
9,600 (10,080) |
5,000 (5,250) |
62,600 (65,730) |
2M |
56,000 (58,800) |
11,200 (11,760) |
5,000 (5,250) |
72,200 (75,810) |
3M |
67,000 (70,350) |
13,400 (14,070) |
5,000 (5,250) |
85,400 (89,670) |
4M |
80,000 (84,000) |
16,000 (16,800) |
5,000 (5,250) |
101,000 (106,050) |
5M |
94,000 (98,700) |
18,800 (19,740) |
5,000 (5,250) |
117,800 (123,690) |
6M |
125,000 (131,250) |
25,000 (26,250) |
5,000 (5,250) |
155,000 (162,750) |
7M |
134,000 (140,700) |
26,800 (28,140) |
5,000 (5,250) |
165,800 (174,090) |
8M |
144,000 (151,200) |
28,800 (30,240) |
5,000 (5,250) |
177,800 (186,690) |
9M |
154,000 (161,700) |
30,800 (32,340) |
5,000 (5,250) |
189,800 (199,290) |
10M |
163,000 (171,150) |
32,600 (34,230) |
5,000 (5,250) |
200,600 (210,630) |
20M |
175,000 (183,750) |
35,000 (36,750) |
5,000 (5,250) |
215,000 (225,750) |
30M |
187,000 (196,350) |
37,400 (39,270) |
5,000 (5,250) |
229,400 (240,870) |
40M |
200,000 (210,000) |
40,000 (42,000) |
5,000 (5,250) |
245,000 (257,250) |
50M |
212,000 (222,600) |
42,400 (44,520) |
5,000 (5,250) |
259,400 (272,370) |
60M |
224,000 (235,200) |
44,800 (47,040) |
5,000 (5,250) |
273,800 (287,490) |
70M |
236,000 (247,800) |
47,200 (49,560) |
5,000 (5,250) |
288,200 (302,610) |
80M |
247,000 (259,350) |
49,400 (51,870) |
5,000 (5,250) |
301,400 (316,470) |
90M |
258,000 (270,900) |
51,600 (54,180) |
5,000 (5,250) |
314,600 (330,330) |
100M |
270,000 (283,500) |
54,000 (56,700) |
5,000 (5,250) |
329,000 (345,450) |
|
|

| * |
The wiring equipment rental and the line unit rental are unnecessary. Wire equipment usage fees and DSU/ONU (Termination) Usage Fee are unnecessary. |
| * |
Figures in parentheses include consumption tax. |
|
 |

 |  | |



| (Unit: Japanese Yen) |
Product Speed (in bps) |
Main Contract Line |
Dual Access Usage Fee |
Total |
Line Usage Fee |
Wire Equipment Usage Fee |
DSU/ONU Usage Fee |
0.5M |
66,000 (69,300) |
2,000 (2,100) |
5,000 (5,250) |
13,200 (13,860) |
86,200 (90,510) |
44,000 [3] (46,200) |
2,000 (2,100) |
5,000 (5,250) |
8,800 (9,240) |
59,800 (62,790) |
1M |
76,000 (79,800) |
2,000 (2,100) |
5,000 (5,250) |
15,200 (15,960) |
98,200 (103,110) |
51,000 [3] (53,550) |
2,000 (2,100) |
5,000 (5,250) |
10,200 (10,710) |
68,200 (71,610) |
2M |
113,000 (118,650) |
2,000 (2,100) |
5,000 (5,250) |
22,600 (23,730) |
142,600 (149,730) |
70,000 [3] (73,500) |
2,000 (2,100) |
5,000 (5,250) |
14,000 (14,700) |
91,000 (95,550) |
3M |
138,000 (144,900) |
2,000 (2,100) |
5,000 (5,250) |
27,600 (28,980) |
172,600 (181,230) |
85,000 [3] (89,250) |
2,000 (2,100) |
5,000 (5,250) |
17,000 (17,850) |
109,000 (114,450) |
4M |
160,000 (168,000) |
2,000 (2,100) |
5,000 (5,250) |
32,000 (33,600) |
199,000 (208,950) |
102,000 [3] (107,100) |
2,000 (2,100) |
5,000 (5,250) |
20,400 (21,420) |
129,400 (135,870) |
5M |
181,000 (190,050) |
2,000 (2,100) |
5,000 (5,250) |
36,200 (38,010) |
224,200 (235,410) |
119,000 [3] (124,950) |
2,000 (2,100) |
5,000 (5,250) |
23,800 (24,990) |
149,800 (157,290) |
6M |
185,000 (194,250) |
2,000 (2,100) |
5,000 (5,250) |
37,000 (38,850) |
229,000 (240,450) |
7M |
189,000 (198,450) |
2,000 (2,100) |
5,000 (5,250) |
37,800 (39,690) |
233,800 (245,490) |
8M |
193,000 (202,650) |
2,000 (2,100) |
5,000 (5,250) |
38,600 (40,530) |
238,600 (250,530) |
9M |
197,000 (206,850) |
2,000 (2,100) |
5,000 (5,250) |
39,400 (41,370) |
243,400 (255,570) |
10M |
200,000 (210,000) |
2,000 (2,100) |
5,000 (5,250) |
40,000 (42,000) |
247,000 (259,350) |
20M |
220,000 (231,000) |
2,000 (2,100) |
5,000 (5,250) |
44,000 (46,200) |
271,000 (284,550) |
30M |
240,000 (252,000) |
2,000 (2,100) |
5,000 (5,250) |
48,000 (50,400) |
295,000 (309,750) |
40M |
259,000 (271,950) |
2,000 (2,100) |
5,000 (5,250) |
51,800 (54,390) |
317,800 (333,690) |
50M |
279,000 (292,950) |
2,000 (2,100) |
5,000 (5,250) |
55,800 (58,590) |
341,800 (358,890) |
60M |
299,000 (313,950) |
2,000 (2,100) |
5,000 (5,250) |
59,800 (62,790) |
365,800 (384,090) |
70M |
319,000 (334,950) |
2,000 (2,100) |
5,000 (5,250) |
63,800 (66,990) |
389,800 (409,290) |
80M |
338,000 (354,900) |
2,000 (2,100) |
5,000 (5,250) |
67,600 (70,980) |
412,600 (433,230) |
90M |
358,000 (375,900) |
2,000 (2,100) |
5,000 (5,250) |
71,600 (75,180) |
436,600 (458,430) |
100M |
378,000 (396,900) |
2,000 (2,100) |
5,000 (5,250) |
75,600 (79,380) |
460,600 (483,630) |
|


| * |
Figures in parentheses include consumption tax. |



| (Unit: Japanese Yen) |
Product Speed (in bps) |
Main Contract Line Usage Fee |
Dual Access Usage Fee |
DSU/ONU Usage Fee |
Total |
0.5M |
44,000 (46,200) |
8,800 (9,240) |
5,000 (5,250) |
57,800 (60,690) |
1M |
46,000 (48,300) |
9,200 (9,660) |
5,000 (5,250) |
60,200 (63,210) |
2M |
50,000 (52,500) |
10,000 (10,500) |
5,000 (5,250) |
65,000 (68,250) |
3M |
58,000 (60,900) |
11,600 (12,180) |
5,000 (5,250) |
74,600 (78,330) |
4M |
66,000 (69,300) |
13,200 (13,860) |
5,000 (5,250) |
84,200 (88,410) |
5M |
74,000 (77,700) |
14,800 (15,540) |
5,000 (5,250) |
93,800 (98,490) |
6M |
80,000 (84,000) |
16,000 (16,800) |
5,000 (5,250) |
101,000 (106,050) |
7M |
85,000 (89,250) |
17,000 (17,850) |
5,000 (5,250) |
107,000 (112,350) |
8M |
90,000 (94,500) |
18,000 (18,900) |
5,000 (5,250) |
113,000 (118,650) |
9M |
95,000 (99,750) |
19,000 (19,950) |
5,000 (5,250) |
119,000 (124,950) |
10M |
100,000 (105,000) |
20,000 (21,000) |
5,000 (5,250) |
125,000 (131,250) |
20M |
106,000 (111,300) |
21,200 (22,260) |
5,000 (5,250) |
132,200 (138,810) |
30M |
112,000 (117,600) |
22,400 (23,520) |
5,000 (5,250) |
139,400 (146,370) |
40M |
117,000 (122,850) |
23,400 (24,570) |
5,000 (5,250) |
145,400 (152,670) |
50M |
123,000 (129,150) |
24,600 (25,830) |
5,000 (5,250) |
152,600 (160,230) |
60M |
128,000 (134,400) |
25,600 (26,880) |
5,000 (5,250) |
158,600 (166,530) |
70M |
134,000 (140,700) |
26,800 (28,140) |
5,000 (5,250) |
165,800 (174,090) |
80M |
139,000 (145,950) |
27,800 (29,190) |
5,000 (5,250) |
171,800 (180,390) |
90M |
145,000 (152,250) |
29,000 (30,450) |
5,000 (5,250) |
179,000 (187,950) |
100M |
150,000 (157,500) |
30,000 (31,500) |
5,000 (5,250) |
185,000 (194,250) |
|

| * |
The wiring equipment rental and the line unit rental are unnecessary. Wire equipment usage fees and DSU/ONU (Termination) Usage Fee are unnecessary. |
| * |
Figures in parentheses include consumption tax. |

| (Unit: Japanese Yen) |
Redundancy Function |
New installation fee[4] |
30,000 (31,500) |
Changes to SPU (Select Port Unit) |
4,500 (4,725) |
|

| [4] |
If the dual access line is installed at the same as the main line this fee is not required. |

| * |
Figures in parentheses include consumption tax. |
|
|


|